Our Services

Kitchen Remodel in Colorado Springs: Interior Remodeling, Basements, Flooring & Built-Ins

Kitchen remodels from cosmetic refreshes to full renovations, plus basement finishing, flooring, finish carpentry, and built-ins, planned around PPRBD permits and priced flat-rate. 15+ years of Colorado construction experience and $2M in general liability coverage. Free written estimate.

Get Free Estimate → (719) 243-9718
★★★★★ 5.0 on Google 5 reviews, every one five stars. Read them on Google "He charged exactly what he quoted, and he finished the job quickly." Google review

A kitchen remodel in Colorado Springs with us runs from a $5,000 cosmetic refresh with no PPRBD permit to $40,000 and up for a full renovation, and the same crew handles the rest of your interior remodeling too: basement finishing, flooring, finish carpentry, and built-ins. It is built for homeowners who want one person accountable for the whole job instead of juggling a cabinet installer, a flooring installer, and a permit runner. We work in Colorado Springs and the surrounding areas, including Monument, Black Forest, Fountain, and Woodland Park. The key qualification: painting, cabinets, and flooring stay permit-free, but moving plumbing, adding a circuit, changing a wall, or finishing a basement does, and I plan the job around that from the first estimate. Every project starts with a free written estimate and flat-rate pricing, so the number you agree to is the number you pay.

At 6,035 feet, Colorado Springs kitchens live with winter indoor air that often drops to 10–20% humidity, so wood cabinet doors and hardwood floors shrink and gap through the season. Most homes built after 1980 also sit on a concrete slab on the main level, which limits how flooring can go down. City water is soft to moderately hard, about 1.3 to 2.8 grains per gallon, but homes on a private well, common in Black Forest, Falcon, and Monument, can have genuinely hard water that leaves scale on faucets and fixtures. Those three conditions shape the cabinet finish, flooring, and fixture choices I make in a kitchen here.

What Interior Remodeling Services Do We Offer in Colorado Springs?

We handle five kinds of interior work, from a single cabinet repaint to a full gut:

Kitchen Remodels: Cosmetic refreshes, mid-range remodels, and full renovations with islands and open-concept layouts. Our Colorado Springs kitchen remodel guide covers costs and permits in depth, and the order a kitchen remodel happens in walks through each phase. If you want an island, the kitchen island guide covers the electrical requirements and the slab problem.

Cabinets, Countertops & Backsplash: Painting, refacing, or replacing cabinets, plus quartz, granite, or laminate countertops and tile backsplash. The cabinet painting, refinishing, and replacement comparison, the countertop materials guide, and the backsplash guide help you pick before you price. Cabinet and wall finishing also lives on our painting and finishes page.

Basement Finishing: Framing, insulation, flooring, lighting, and trim to turn an unfinished basement into living space, always under a PPRBD permit. I don’t take drywall work, so I bring in a drywall sub for the hanging and finishing and tell you up front. The basement finishing cost and egress guide and the basement finishing permit guide cover what PPRBD checks first.

Flooring: LVP (luxury vinyl plank), engineered hardwood, solid hardwood, laminate, and tile, with subfloor prep for slab homes. The flooring comparison for Colorado Springs homes explains which one holds up to dry winter air.

Finish Carpentry, Stairs & Built-Ins: Baseboard, crown molding, interior doors, accent walls, stair railings, built-in bookcases and home-office workstations, and fireplace mantels. Our stair railing guide covers the code requirements and material options.

Bathrooms get their own page, because the waterproofing makes them a different job. See our bathroom remodels.

What Does a Kitchen Remodel Cost in Colorado Springs?

A kitchen remodel in Colorado Springs typically costs $5,000–$15,000 for a cosmetic refresh, $15,000–$40,000 for a mid-range remodel, and $40,000 and up for a full renovation with layout changes. The scope, not the square footage, is what moves a project between tiers.

ScopeTypical CostPermit?
Cosmetic refresh (painted or refaced cabinets, hardware, backsplash, lighting)$5,000–$15,000No
Mid-range remodel (new cabinets or full refinish, new countertops, new flooring)$15,000–$40,000Only if plumbing or circuits change
Full renovation (layout changes, island, wall removal)$40,000+Yes

Here is what each tier assumes, because a price with no scope behind it is just a number:

  • Cosmetic refresh: The layout and cabinet boxes stay. Market ranges for an average kitchen run about $2,000–$6,500 to paint cabinets or $5,000–$13,000 to reface them (replacing the doors and drawer fronts and keeping the boxes). Tile backsplash runs about $25–$35 per square foot installed (The Spruce), and the top of this tier is where refacing plus a backsplash lands.
  • Mid-range remodel: The layout stays, but the cabinets and counters change. New cabinets run $150–$500 per linear foot installed (HomeGuide), quartz or granite counters run $50–$200 per square foot installed (HomeGuide), and LVP flooring in Colorado Springs runs $3–$15 per square foot installed (CostOnce).
  • Full renovation: The sink, range, or walls move, or an island with power and plumbing goes in. Permits, inspections, and the licensed electrical and plumbing trades are all part of this scope, and the written estimate is where the final number gets fixed.

Appliances are priced separately in every tier because the spread between models is so wide. The cabinet, countertop, and flooring figures are market averages from the sources linked above, not a quote for your kitchen (a written estimate is the quote).

Basement finishing is priced by the square foot instead. Colorado Springs market ranges run about $50–$100 per square foot for a permitted finish (framing, insulation, drywall by a sub, flooring, trim, and electrical and plumbing by licensed trades), from a straightforward finish at the low end to a kitchenette, full bath, and custom millwork at the top, and the basement finishing guide breaks down the tiers. Built-in bookcases run about $300–$850 per linear foot installed (HomeGuide), and an interior stair railing runs about $20–$60 per linear foot (HomeGuide).

A planning guideline I use to sanity-check any big number is the 30% rule for home renovation, which compares a single project’s cost to what your home is worth.

Not sure which tier your kitchen falls into? A free written estimate gives you a flat-rate number before any work starts.

Request Free Estimate → (719) 243-9718

Do I Need a PPRBD Permit for a Kitchen or Interior Remodel?

You do not need a permit for cosmetic work, and you do need one when the remodel moves plumbing, adds an electrical circuit, changes a wall, or finishes a basement. Most Colorado Springs addresses are permitted through PPRBD, the Pikes Peak Regional Building Department, though a few city-limit addresses go through City of Colorado Springs Development Services, so confirm your address first.

PPRBD’s homeowner permit page lists painting, installing flooring, and replacing kitchen cabinets as work that generally needs no permit, and it lists electrical work and a basement finish as work that does. That matches how I scope a kitchen: swapping cabinets in the same layout, laying flooring, and painting are permit-free, while moving the sink, adding a pot filler or island sink, adding outlets or a circuit, or cutting a new exterior hole for a range hood vent is not. (Countertop swaps in the same footprint are the same kind of finish work, and I confirm anything borderline with PPRBD at (719) 327-2880 before I price it.) PPRBD also states that a homeowner cannot pull a permit for a contractor hired to do the work, which is why the contractor on the job handles the application through final inspection. Skipping a required permit tends to surface at resale, which is covered in our remodeling permits guide for Colorado Springs.

Basements are the exception to “it depends.” Every basement finish needs a permit and plan review, with separate electrical and plumbing permits when those trades are involved. The basement finishing permit guide walks through the inspection sequence.

Should I Hire a Handyman or a Contractor for a Kitchen Remodel?

For a cosmetic or mid-range kitchen that keeps the layout, a handyman crew is the right fit, and for anything that moves plumbing, adds a circuit, changes a wall, or finishes a basement, you need permitted, licensed trade work, whoever coordinates it. The line is the permit, not the size of the check.

Demo, cabinet install, tile, flooring, paint, trim, and built-ins are handyman-scope jobs, and having one crew do them keeps the schedule simple. I don’t take drywall or texture work; if a kitchen needs it, I bring in a drywall sub and tell you up front. Once the plan includes new circuits, relocated plumbing, or a removed wall, the licensed electrical and plumbing work gets done under a PPRBD permit and inspected, and we coordinate those trades so you aren’t managing them yourself. We are licensed and insured, and we don’t do roofing, HVAC, or major mechanical work. If a kitchen plan needs it, I’ll tell you up front. Our guide on how to hire a handyman covers what to ask any crew before you sign.

How Long Does a Kitchen Remodel Take, and Will I Be Without a Kitchen?

A kitchen remodel takes 1–2 weeks for a cosmetic refresh and 3–5 weeks for a mid-range remodel. A full renovation takes 5–8 weeks of construction, plus 1–2 weeks for PPRBD permit processing before demo can start. A basement finish adds its own plan review, typically 1–3 weeks before framing starts.

If the remodel includes the cabinets and sink, plan on a temporary kitchen for most of the active work: a hot plate, a microwave, and a tub for dishes (I have yet to meet a homeowner who loved this part). We don’t start demo until the cabinets, countertop materials, and flooring are on site, because a missing item mid-job is what turns a five-week kitchen into an eight-week one. The order a kitchen remodel happens in walks through every phase, including why countertops are measured only after the cabinets are set.

What Is Commonly Found Behind the Walls in Older Colorado Springs Homes?

The most common surprises in older Colorado Springs homes are old galvanized supply pipes, flooring and adhesive that need testing before they are disturbed, kitchens with fewer electrical circuits than modern appliances need, and moisture in basements. These are patterns by home age, not predictions for your house, which is why we build a contingency into the estimate.

  • Galvanized supply lines: Steel water pipes were common in homes built before roughly 1970, and they corrode from the inside. If the kitchen walls are open anyway, replacing them is the sensible time.
  • Possible asbestos in old flooring and adhesive: Some floor tile and the adhesive under it from the mid-20th century can contain asbestos, so it should be tested before demolition rather than assumed. The EPA’s asbestos page explains where it was used. The same goes for popcorn ceilings from that era.
  • Too few circuits: An older kitchen often has fewer circuits than today’s appliances need, and adding one means an electrical permit and a licensed electrician. I price that as its own line so it never surprises you.
  • Slab moisture under new flooring: Even in a dry climate, a concrete slab can hold moisture that debonds LVP or cups wood. Flooring manufacturers generally require a slab moisture test (an in-slab relative humidity test under ASTM F2170) before installation, and the product’s own installation guide sets the limit.
  • Basement moisture and mold: Basement walls and slabs need to be checked for moisture before anything gets framed over them, and a finished basement should be tested for radon, since El Paso County sits in the EPA’s highest radon zone. Our mold and mildew guide for Colorado Springs covers what is cosmetic and what means the wall has to open.

What Do Our Finished Interior Remodels Look Like?

Finished work from our interior remodels includes kitchen backsplashes, stair railings, and basement framing, and the framing is the part you never see once the drywall goes up. Here are four examples from real jobs.

Finished kitchen with an arched alcove, exposed brick backsplash behind a stainless gas range, dark stained cabinets, and a speckled countertop
Arched alcove with a brick backsplash behind the range, finished.
Blue-gray glass subway tile backsplash above a speckled stone countertop beside a black glass cooktop
Blue-gray glass subway tile backsplash next to the cooktop.
Freshly stained wood stair railing with turned balusters along a carpeted staircase
Stair railing with turned balusters, freshly stained.
Basement bathroom gutted to the studs with new framing and pink insulation, a plywood subfloor, and a ladder in the room
Basement bathroom framed and insulated, in progress.

The two backsplashes show why I like to treat a backsplash as its own decision. The brick sits in a built-in arch and the glass tile runs wall to wall, and each one changes how the counter and range read. Our kitchen backsplash guide compares materials and costs. The basement photo is the stage where framing, insulation, and plumbing rough-in get checked, well before any finish goes on.

Want this level of care on your kitchen or basement? Request a free estimate or call (719) 243-9718.

Request Free Estimate → (719) 243-9718

How Does Our Remodeling Process Work?

Every interior remodel follows the same five steps, so you always know what comes next:

  1. Free estimate: We look at the space, talk through scope and budget, and you get a written flat-rate estimate.
  2. Scope and selections: We settle the layout, cabinets, counters, and flooring, and order long-lead items before demo.
  3. Permits, if needed: If plumbing moves, a circuit is added, a wall changes, or a basement is being finished, the PPRBD permit is applied for before demo.
  4. Build: Demo, rough-in, drywall (by a drywall sub when the job needs it), cabinets, counters, flooring, and finish, with inspections at the required points.
  5. Walkthrough: We go over the finished space with you and fix anything on the punch list.

Ready to price your kitchen or basement? Request a free estimate or call (719) 243-9718.

Kitchen remodel in progress with new white shaker cabinets and marble-look countertops in a Colorado Springs home

Service Includes

  • ✓Kitchen remodels, cosmetic to full
  • ✓Cabinets, countertops & backsplash
  • ✓Basement finishing (permitted)
  • ✓Flooring (LVP, hardwood, tile)
  • ✓Finish carpentry, stairs & built-ins
Free Written Estimate

Every project gets a detailed written estimate with flat-rate pricing before work begins. Call (719) 243-9718 or submit the estimate form.

Common Questions

Frequently Asked Questions

How much does a kitchen remodel cost in Colorado Springs?+
A cosmetic refresh (painted or refaced cabinets, new hardware, backsplash, lighting, no layout change) runs $5,000–$15,000 and needs no permit. A mid-range remodel with new cabinets or a full refinish, new countertops, and new flooring runs $15,000–$40,000, and needs a PPRBD permit only if plumbing or electrical circuits change. A full renovation with layout changes, an island, or a removed wall starts at $40,000 and requires permits. Appliances are priced separately in each tier. Every project gets a free written, flat-rate estimate before work starts.
Do I need a permit for a kitchen remodel in Colorado Springs?+
Not for cosmetic work. PPRBD, the Pikes Peak Regional Building Department, lists painting, flooring, and replacing kitchen cabinets as work that generally needs no permit. You do need one to add or move an electrical circuit, relocate plumbing (moving the sink, adding an island sink), change a wall, or vent a range hood through a new hole in an exterior wall. PPRBD also states that a homeowner cannot pull a permit for a contractor hired to do the work, so the contractor handles the application. Confirm your address with PPRBD at (719) 327-2880 before you plan the scope.
Should I paint, reface, or replace my kitchen cabinets?+
Paint or reface if the cabinet boxes are solid and the layout works, and replace them if the boxes are damaged or the layout has to change. Market ranges for an average kitchen run about $2,000–$6,500 to paint, about $5,000–$13,000 to reface, and $150–$500 per linear foot to replace with new cabinets installed. Painting and refacing are cosmetic work with no permit. Replacing cabinets in the same layout also needs no permit, but moving them to a new layout usually brings plumbing or electrical changes that do.
Do you finish basements in Colorado Springs, and what does it cost?+
Yes. A finished basement is priced by the square foot, and Colorado Springs market ranges run about $50–$100 per square foot for a permitted finish (framing, insulation, drywall by a sub, flooring, trim, and electrical and plumbing by licensed trades), depending on how basic or high-end the finish is. Finishing a basement always needs a PPRBD permit and plan review, plus separate electrical and plumbing permits if you add circuits, a bathroom, or a wet bar. Plan on 1–3 weeks of PPRBD plan review before framing starts. We handle the framing, flooring, and trim, and coordinate the licensed electrical and plumbing trades under the permit. I don't take drywall work myself, so I bring in a drywall sub and tell you up front.
How long does a kitchen remodel take in Colorado Springs?+
A cosmetic refresh takes 1–2 weeks of active work. A mid-range remodel takes 3–5 weeks. A full renovation takes 5–8 weeks of construction, plus 1–2 weeks for PPRBD permit processing before demo can start. We don't start demo until the cabinets, countertop materials, and flooring are on site, because waiting on one missing item mid-job is what stretches a kitchen schedule.

Ready to Get Started?

Free written estimate. Flat-rate pricing. No surprises. Serving Colorado Springs and the Pikes Peak region.

Get Free Estimate → (719) 243-9718